Education Construction Energy Construction Health Care Construction Hospitality and Commercial Construction Manufacturing and Industrial Construction Special Projects
PC Construction Construction History PC Construction Construction Timeline PC Construction News PC Construction Blog
Markets Services LEED Certified Construction Featured Projects Client Testimonials Case Studies
Careers College Students craft-positions professional-employment Employee Ownership Benefits Employee Development Meet Our Crew
Community Sustainable Construction Services

FEATURED PROJECTS

 

Our power generation or combined heat and power projects range from traditional methods to new sustainable technologies. Here are some examples of how PC Construction has powered our clients’ energy goals. CLICK A PROJECT TITLE BELOW TO LEARN MORE.

spacer
Burlington Electric Department
               
McNeil Generating Station Construction, Burlington, VT   McNeil Generating Station, Burlington, VT: The installation of a 50-megawatt turbine generator in addition to site work, concrete work, underground piping, superstructure fit-up, support structures, and mechanical piping          
               
Colby College
               
Research and Manufacturing Construction   Central Heating Plant Expansion, Waterville, ME: An expansion of the Central Heating Plant to house new biomass equipment and appurtenances; this project is pursuing a LEED Certified rating          
               
Dartmouth College
               
Dartmouth College Boiler Construction   Boiler No. 2 Replacement, Hanover, NH: The replacement of the existing boiler with a new 75,000 lb./hr. boiler as well as renovations to the existing steam plant, replacement of the existing 100-year old roof and clerestory over the boiler room, upgrade and replacement of the existing equipment, piping, and systems, major transfer of campus electrical feeds to new electrical transformers, and extensive modernization of adjacent fuel oil facility          
               
Green Mountain Power
               
Bolton Falls Timber Crib Dam Construction, Duxbury, VT   Bolton Falls Timber Crib Dam Repair, Duxbury, VT: The installation of a temporary cofferdam and dewatering of the head pond to remove and replace the existing timber crib dam   Essex #19 Dam Construction, Essex, VT   Essex #19 Dam Repair, Essex, VT: The repair of over 300 square feet of dam facing, including demolition and associated concrete work  
               
Vergennes Hydro #19 Unit #1 Construction, Vergennes, VT   Vergennes Hydro #19 Unit #1, Vergennes, VT: The demolition of an existing turbine and support bridge and installation of a new one megawatt turbine with ancillary items, and structural steel support bridge, in addition to rewiring the existing generator, electrical, and controls   Essex Hydro Minimum Flow Unit Construction, Essex, VT   Essex Hydro Minimum Flow Unit, Essex, VT: The demolition of an existing turbine and installation of a new .85 megawatt turbine with ancillary items, penstock, electrical, and controls  
               
Essex #19 Diesels Construction, Essex, VT   Essex #19 Diesels, Essex, VT: The demolition of existing generators and installation of four new two megawatt diesel generators   Marshfield Penstock Replacement Construction, Marshfield, VT   Marshfield Penstock Replacement, Marshfield, VT: The replacement of three miles of 60-inch penstock over a three-year period  
               
Middlesex Hydro Plant #2 Dam Spillway Repairs, Middlesex, VT   Middlesex Hydro Plant #2 Dam Spillway Repairs, Middlesex, VT: The removal and replacement of 2,000 square feet of concrete facing on the downstream side of the dam        
               
The Jackson Laboratory
               
Research and Manufacturing Construction   Utility Plant Upgrade, Bar Harbor, ME: Construction of a new 1200 horsepower biomass-fired utility plant utilizing a wood-powder suspension combustion technology          
               
Plymouth State University
               
Central Campus Infrastructure Construction, Plymouth, NH   Central Campus Infrastructure, Plymouth,
NH:
Infrastructure upgrades on the campus and town streets including steam, water, electrical, and telephone/data
         
               
Proctor Academy
               
Biomass Project Construction, Andover, NH   Biomass Project, Andover, NH: A 2,500 square foot expansion and 1,100 square foot renovation of the existing central heating plant including repair of the existing boiler plant building and addition of a biomass-fired boiler and biomass fuel storage          
               
Purpose Energy
               
Purpose Energy Anaerobic Digester Construction, South Burlington, VT   PurposeEnergy Anaerobic Digester, South Burlington, VT: A design/build project involving the construction of a 2 billion BTU digester facility adjacent to the existing Magic Hat Brewing Co.; the patented digester design creates methane from the remnants of the brewing process and uses it to power the brewery's boiler and other systems that traditionally run on natural gas          
               
Vermont Public Power Supply Authority
               
VPPSA Electricity Generation Station Construction, Swanton, VT   VPPSA Electricity Generation Station, Swanton, VT: A new 40 MW peaking power plant with two onsite fuel storage tanks and a demineralized water storage tank, both with ancillaries, a 13.8kV/46kV 67 substation, and a .7 mile-long 46kV transmission line; this project will be the third largest non-hydoelectric power plant in Vermont and the fifth largest of all power generation types in Vermont.          
               
Washington Electric Cooperative
               
Washington Electric Cooperative Cogeneration Facility Construction   Cogeneration Facility, Coventry, VT: A fast-track, design/build, 7,000 square foot cogeneration facility capable of producing four megawatts of electricity; project included the installation of gas, engine cooling water, oil, waste oil, compressed air, antifreeze, and hot water process piping systems as well as support equipment and systems          
               
Winooski One Partnership
               
Winooski One Hydroelectric Facility Construction, Winooski, VT   Winooski One Hydroelectric Facility, Winooski, VT: This project included the design and construction of a 7.2 MW hydroelectric facility          
               
BackgroundBackgroundMeet Our CrewNewsBlogLinksSite MapPrivacy PolicyTerms of UseHomeBackground100% Employee OwnedBackgroundBackgroundCopyright 2011 PC ConstructionBackgroundBackground100% Employee OwnedBackground