Bolton Falls Timber Crib Dam Repair, Duxbury, VT: The installation of a temporary cofferdam and dewatering of the head pond to remove and replace the existing timber crib dam |
|
 |
|
Essex #19 Dam Repair, Essex, VT: The repair of over 300 square feet of dam facing, including demolition and associated concrete work |
|
| |
|
|
|
|
|
|
|
 |
|
Vergennes Hydro #19 Unit #1, Vergennes, VT: The demolition of an existing turbine and support bridge and installation of a new one megawatt turbine with ancillary items, and structural steel support bridge, in addition to rewiring the existing generator, electrical, and controls |
|
 |
|
Essex Hydro Minimum Flow Unit, Essex, VT: The demolition of an existing turbine and installation of a new .85 megawatt turbine with ancillary items, penstock, electrical, and controls |
|
| |
|
|
|
|
|
|
|
 |
|
Essex #19 Diesels, Essex, VT: The demolition of existing generators and installation of four new two megawatt diesel generators |
|
 |
|
Marshfield Penstock Replacement, Marshfield, VT: The replacement of three miles of 60-inch penstock over a three-year period |
|
| |
|
|
|
|
|
|
|
 |
|
Middlesex Hydro Plant #2 Dam Spillway Repairs, Middlesex, VT: The removal and replacement of 2,000 square feet of concrete facing on the downstream side of the dam |
|
|
|
|
|
| |
|
|
|
|
|
|
|