FEATURED PROJECTS

 

The following projects are just a small sampling of what PC Construction’s Special Project teams can do for our clients. These highly skilled teams can perform an extensive range of work in all of our markets, from small hospital renovations to complex energy projects. CLICK A PROJECT TITLE BELOW TO LEARN MORE.

 

Because of the nature of our Special Projects work, photos are often difficult to obtain.

spacer
City of Rutland
               
WTP Filter Structure Construction, Rutland, VT   WTP Filter Structure, Rutland, VT: The removal of 220 precast planks, each weighing up to 15 tons, and the installation of a new 60,000 square foot precast concrete roof over operating filters and a new membrane roof system          
               
Eastern Maine Medical Center
               
University of Maine Cutler Health Construction Phase I, Orono, ME   University of Maine Cutler Health Renovations Phase I, Orono, ME: A renovation of 7,500 square feet of existing clinical space in just five weeks   University of Maine Cutler Health Construction Phase II, Orono, ME   University of Maine Cutler Health Renovations Phase II, Orono, ME: A three-week fast-track renovation of 8,600 square feet of existing space including walls, ceilings, flooring, electrical, and mechanical work in 10 exam rooms, 8 bathrooms, a physical therapy room, optometry room, waiting room, counseling center waiting room, break room, and meeting room  
               
Green Mountain Power
               
Bolton Falls Timber Crib Dam Construction   Bolton Falls Timber Crib Dam Repair, Duxbury, VT: The installation of a temporary cofferdam and dewatering of the head pond to remove and replace the existing timber crib dam   Essex #19 Dam Construction, Essex, VT   Essex #19 Dam Repair, Essex, VT: The repair of over 300 square feet of dam facing, including demolition and associated concrete work  
               
Vergennes Hydro #19 Unit #1 Construction, Vergennes, VT   Vergennes Hydro #19 Unit #1, Vergennes, VT: The demolition of an existing turbine and support bridge and installation of a new one megawatt turbine with ancillary items, and structural steel support bridge, in addition to rewiring the existing generator, electrical, and controls   Essex Hydro Minimum Flow Unit Construction, Essex, VT   Essex Hydro Minimum Flow Unit, Essex, VT: The demoliltion of an existing turbine and installation of a new .85 megawatt turbine with ancillary items, penstock, electrical, and controls  
               
Essex #19 Diesels Construction, Essex, VT   Essex #19 Diesels, Essex,
VT:
The demolition of existing generators and installation of four new two megawatt diesel generators
  Marshfield Penstock Construction, Marshfield, VT   Marshfield Penstock Replacement, Marshfield,
VT:
The replacement of three miles of 60-inch penstock over a three-year period
 
               
Middlesex Hydro Plant #2 Dam Spillway Repairs, Middlesex, VT   Middlesex Hydro Plant #2 Dam Spillway Repairs, Middlesex, VT: The removal and replacement of 2,000 square feet of concrete facing on the downstream side of the dam        
               
L.L. Bean
               
Home Store Fit-Out Construction, Freeport, ME   Home Store Fit-Out, Freeport, ME: A renovation of 11,000 square feet of existing space in eight weeks, including new walls, carpet, ceiling, paint, drywall, electrical, fire alarm, and new wood flooring   Kids Store Fit-Out Construction   Kids Store Fit-out, Freeport, ME: The renovation the 11,000 square feet existing Kids Store in four weeks, including new walls, carpet, ceilings, paint, drywall, electrical, fire alarm, and new wood flooring  
               
Moose Shed Construction, Freeport, ME   Moose Shed, Freeport, ME: An expansion to the L.L. Bean Flagship Store to serve as an exhibit, including new foundation, exterior walls, and roof   Returns Building Window Construction   Returns Building Window Repairs, Freeport, ME: Removed existing windows, installed new sill and flashing for window, and reinstalled existing windows  
               
Maine Community College System
               
Eastern Maine Community College Maine Hall Window Construction, Bangor, ME   Eastern Maine Community College Maine Hall Window Replacement, Bangor, ME: A fast-track replacement of 205 windows, including the demolition of the existing window systems, framing in the exterior opening for smaller windows, installing densglass, new vinyl windows, EIFS, and caulking on the exterior   Southern Maine Community College Concrete Floor Construction   Southern Maine Community College Concrete Floor Repairs, South Portland, ME: The removal and replacement of the damaged concrete floor and metal decking in the Construction Technology Department  
               
Peerless Insurance
               
Agency Market Fit-out Construction, Portland, ME   Agency Market Fit-out, Portland, ME: A 4,000 square foot renovation to construct a new conference room, break area, and vice president’s office within existing building, including new walls, drywall, flooring, paint, and ACT ceilings          
               
Revera Health System
               
Burlington Health & Rehab Structural Construction   Burlington Health & Rehab Structural Upgrades, Burlington, VT: The structural repair of the precast concrete plank in the existing five-story building   Berlin Health & Rehab Construction   Berlin Health & Rehab, Berlin, VT: Interior architectural repairs and upgrades to the existing building  
               
Rowan Health & Rehab Construction   Rowan Health & Rehab, Barre, VT: Interior architectural repairs and upgrades to the existing building          
               
Scarborough School District
               
Photo Not Available   Sprinkler Break Repairs, Scarborough, ME: The repair of damaged drywall due to a sprinkler break at Scarborough High School   Photo Not Available   Door, Window, and Masonry Replacement, Scarborough, ME: The replacement of four doors and frames at Wentworth Middle School due to water infiltration  
               
Washington Electric Cooperative
               
Cogeneration Facility, Coventry, VT   Cogeneration Facility, Coventry, VT: A fast-track, design-build, 7,000 square foot cogeneration facility capable of producing 4 megawatts of electricity and including the installation of gas, engine cooling water, oil, waste oil, compressed air, antifreeze, and hot water process piping systems; since the original project was constructed, PC Construction has added two additional gensets, increasing capacity to 7.5 megawatts        
               
WCAX-TV
               
Colocation Transmission Building, Stowe, VT   Colocation Transmission Building, Stowe, VT: A new 7,000 square foot transmission building on the summit of Mt. Mansfield for the broadcast of high definition television; facility was constructed over the existing transmission building with transferring systems before the existing building was demolished to allow for 24/7 operation          
               